Main stages of repair works in the apartment.
How to start repair works of the apartment?

One more among the most important and "dirty" works is the window block replacement. It is required to do this first off due to the fact that dirt and dust will be unallowable throughout following stages and it is prohibited at all to open windows during painting and wallpaper works (big drops of the temperature level and moisture are unallowable). After installing windows and windowsills it is essential to pack them immediately in polyethylene movie and to cover windowsills in addition by the fiber board (in order to avoid scratches).
The following phase is electrical wiring. Wiring can be set up in walls or along the floor. Circuitry is made inside the pipelines to make sure electrical safety and boost dependability. The pipeline secures electrical wiring from external damages and allows to change the wire entirely without breaking walls and flooring simply by placing the brand-new wire instead of the old one.
House Painting follows the circuitry. The regular mistake throughout the simultaneous conducting of such works happens when workers forget to set out one of the cable televisions and home painters have actually already plastered and ravelled the wall. As a result, extra works are necessary to seal goes after on the finished wall. The places of the feed switch and wall outlet area and their number must be thought-out in advance. The scheme of power wiring is generally included into the design project.
Later on the system must be ready to service in case of failures. In addition to the wirings, the telephone cable television and the television cable are laid out. The power cable hot water heater brands need to not be laid out near the telephone and antenna cable televisions to prevent sound pickup and disturbance. The most peculiar moment is laying out the television cable television. In order to make two (or three) TV sets in the home the 2nd cable television is typically simply "firmly soldered" in parallel, so the cable resistance is lowered. As an outcome, the display quality is deteriorated, many programs can't be received and etc. In order to avoid such circumstance it is essential to welcome a specialist with unique equipment. He will measure the signal level of the each TV-feeder and install TV-amplifiers or TV-filters.
Painting is the most long-lasting procedure, that is why it is performed at the same time in all premises, if it is possible. Hold-ups are linked with the technology. Each applied layer of the plaster (or filling in ending up) must dry entirely before the work will continue.
Works in hygienic plans and the kitchen area begin at the same time with home painting. It is much better to meet so-called "dirty" works in the top place and at the same time. In accordance with the strategy of the hygienic specialist place welding, wall chasing and pipe run are performed. Steam radiator admissions are prepared, taps and brackets are mounted, but radiators are not installed.
Then operates in hygienic arrangements are conducted according to the plan. The bath is installed, then walls are smoothed out and the tile is laid on walls. The following phase is assembling ceiling and laying tiles on the flooring. And at last other sanitary gadgets, mixers and devices are mounted.
After electrical wiring, setup of rosette plates and terminal boxes the voltage is checked in all point. Ends of wiring are insulated and laid out into rosette plates. Sockets and breakers are not set up during this stage in order to save their surface appearance. The finish puttying of walls is conducted concurrently. The technologically precise control of drying of the layer of the plaster (filling) is carried out by drymeter. It is a special instrument that determines wetness of the material.
The following phase is the procedure of fill. Fill can be made with various materials-- from normal masonry cement-sand mix to self-aligning floorings. The benefit of the simple mix is its cheapness, the drawback is that such mixture is much more difficult lined up at the level and the last dry time of such fill is 40 days, only then the next stage of the deal with floor can be performed, i.e. the duration is too long. Self-leveling self-aligning floorings are a lot more costly, however more technological. Aligning occurs practically "automatically" i.e. fluid solution of mixture is put out, then it runs and you receive the horizontal surface area. The final dry time is 15 days i.e. you have significant time economy. The system "warm floor" is installed into the fill. If the so-called "wet processes" are inapplicable the technology of the dry aligning (the fill technology) is utilized bases for floorings with adjustable floor battens are mounted.
After fill door boxes and door are set up. Setup of doors should take into the account density of future flooring covering. After setup the door can be removed its hinges and got rid of till completion of repair work or packed into polyethylene movie to secure from damages. Concurrently ceiling can be painted and the tile can be laid in that facilities where it was planned. The tile needs to be laid on the definitely dry overlay.
Finishing of the flooring mounting depends upon the planned covering. In many cases (if surface covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are fixed to the floor by self-tapping screws. One plywood sheet is fixed by 30-50 self-tapping screws to supply the close repairing of plywood and long-lasting service of the flooring without squeak and bulging. The plywood provides the additional heat- and acoustic insulation. After installing of the plywood is ended up, wallpaper for painting can be pasted on walls.
In facilities where finish covering of the floor is laminated floor covering or parquet hoard, the common wallpapers are pasted (not for painting) in the first location. Then the floor covering is mounted.
If finish covering of the flooring is the block parquet, the parquet is laid in the first place, then it is scraped and covered by one layer of lacquer. After this the regular wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending upon the quality of the parquet and lacquer). The discussed repercussion is linked only with such scrambling procedure when the great amount of dust is produced. In spite of the fact that great floor grinders are geared up with the vacuum cleaner, the adequate amount of dust is precipitated on surrounding subjects including walls. Dust is really acerbic and is severely cleaned off. That is why in order not to harm wallpapers, they are pasted after scrambling and in order the parquet do not take in the surplus moisture it is covered by the one layer of lacquer before wallpaper pasting.
After this the main works can be considered to be completed. It is left just to install the plinths, ornamental aspects, breakers and sockets, drape holders, to hang doors, plant-bands and others.
In conclusion it is essential to note that the series of works was listed in basic and can alter depending upon the guaranteed scenario-- the variety of rooms in property, your resources, peculiarities of the building of the multilevel facilities. It is based on common sense and every person capable of analysis can separately create such a series.