Main phases of repair in the home

Main stages of repair works in the apartment.

How to begin repair works of the apartment?

The very first stage of the repair of old houses is the damage and taking apart firstly of the shabby walls and partition walls, removing the wall and ceiling finish. This stage is one of the most "filthy" stages of the repair.

One more amongst the most important and "dirty" works is the window block replacement. It is required to do this firstly because dirt and dust will be unallowable throughout following stages and it is forbidden at all to open windows throughout painting and wallpaper works (large drops of the temperature level and wetness are unallowable). After mounting windows and windowsills it is required to pack them instantly in polyethylene movie and to cover windowsills in addition by the fiber board (in order to avoid scratches).

The following stage is circuitry. Wiring can be installed in walls or along the floor. Circuitry is made inside the pipes to make sure electrical security and increase reliability. The pipeline safeguards wiring from external damages and allows to change the wire totally without breaking walls and flooring simply by placing the new wire rather of the old one.

House Painting follows the circuitry. The regular error during the synchronised conducting of such works occurs when workers forget to lay out among the cables and house painters have actually currently plastered and smoothed out the wall. As an outcome, additional works are essential to seal chases after on the ended up wall. The places of the feed switch and wall outlet area and their number must be thought-out in advance. The scheme of power wiring is typically included into the design project.

image

Later on the system need to be ready to service in case of failures. In addition to the circuitries, the telephone cable television and the television cable are set out. The power cable television must not be laid out near the telephone and antenna cable televisions to prevent sound pickup and disturbance. The most strange minute is setting out the TV cable. In order to make 2 (or three) TV sets in the apartment or condo the 2nd cable television is frequently merely "strongly soldered" in parallel, so the cable resistance is reduced. As a result, the screen quality is deteriorated, lots of programs can't be gotten and etc. In order to prevent such scenario it is needed to invite a professional with unique devices. He will determine the signal level of the each TV-feeder and install TV-amplifiers or TV-filters.

Painting is the most long-term procedure, that is why it is performed at the same time in all properties, if it is possible. Delays are linked with the technology. Each used layer of the plaster (or completing ending up) should dry totally before the work will continue.

Works in hygienic arrangements and the kitchen start concurrently with home painting. It is much better to fulfill so-called "unclean" operate in the first place and at the same time. In accordance with the strategy of the hygienic technician location welding, wall chasing and pipeline run are conducted. Steam radiator admissions are prepared, taps and brackets are mounted, but radiators are not installed.

Then works in sanitary plans are performed according to the plan. The bath is mounted, then walls are smoothed out and the tile is laid on walls. The list below phase is putting together ceiling and laying tiles on the floor. And at last other hygienic devices, mixers and accessories are mounted.

After wiring, installation of rosette plates and terminal boxes the voltage is signed in all point. Ends of electrical wiring are insulated and laid out into rosette plates. Sockets and breakers are not installed throughout this phase in order to save their surface look. The finish puttying of walls is conducted all at once. The highly exact control of drying of the layer of the plaster (filling) is performed by drymeter. It is a special instrument that determines wetness of the material.

The following phase is the procedure of fill. Fill can be made with different materials-- from typical masonry cement-sand mixture to self-aligning floors. The benefit of the easy mixture is its cheapness, the drawback is that such mix is much harder lined up at the level and the last dry time of such fill is 40 days, only then the next phase of the work with floor can be conducted, i.e. the duration is too long. Self-leveling self-aligning floorings are far more pricey, but more technological. Lining up occurs almost "automatically" i.e. fluid service fix hot water heater heating element of mixture is poured out, then it runs and you receive the horizontal surface. The final dry time is 15 days i.e. you have considerable time economy. The system "warm flooring" is set up into the fill. If the so-called "wet procedures" are inapplicable the innovation of the dry aligning (the fill innovation) is utilized bases for floors with adjustable flooring battens are mounted.

After fill door boxes and door are installed. Setup of doors should take into the account density of future flooring covering. After setup the door can be removed its hinges and eliminated till completion of repair or packed into polyethylene film to protect from damages. At the same time ceiling can be painted and the tile can be laid in that properties where it was planned. The tile needs to be laid on the definitely dry overlay.

Finishing of the flooring installing depends on the prepared covering. In many cases (if finish covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are fixed to the floor by self-tapping screws. One plywood sheet is repaired by 30-50 self-tapping screws to offer the close repairing of plywood and long-lasting service of the floor without squeak and bulging. The plywood gives the additional heat- and acoustic insulation. After mounting of the plywood is completed, wallpaper for painting can be pasted on walls.

In properties where surface covering of the floor is laminated flooring or parquet stockpile, the common wallpapers are pasted (not for painting) in the very first place. Then the floor covering is mounted.

If surface covering of the floor is the block parquet, the parquet is laid in the top place, then it is scraped and covered by one layer of lacquer. After this the regular wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending on the quality of the parquet and lacquer). The pointed out repercussion is connected just with such rushing process when the great quantity of dust is created. In spite of the truth that excellent flooring grinders are geared up with the vacuum, the enough amount of dust is precipitated on surrounding subjects including walls. Dust is extremely acerbic and is badly washed off. That is why in order not to damage wallpapers, they are pasted after rushing and in order the parquet do not soak up the surplus moisture it is covered by the one layer of lacquer before wallpaper pasting.

After this the main works can be thought about to be finished. It is hot water heater left only to set up the plinths, decorative aspects, breakers and sockets, curtain holders, to hang doors, plant-bands and others.

In conclusion it is essential to keep in mind that the series of works was listed in basic and can change depending on the guaranteed scenario-- the number of rooms in premise, your resources, peculiarities of the building of the multilevel facilities. It is based on good sense and every person capable of analysis can independently produce such a series.